Provision of new mechanical and public health services to new building. Objectives of the project
include installation of long-lasting, energy efficient plant and equipment to minimise energy
consumption.
The building shall include:
- Renovated Office Area
- Meetings rooms
- New WC and Showering Facilities.
AD Mechanical are among the firms partnering to deliver rebuilding a new multi-use facility on
Brighton Seafront.
The scope of work underway includes:
An all new AHU complete with LTHW Heater Battery was installed in the undercroft of tower and
ducted to existing bespoke Louvres. All new associated ductwork was installed in throughout the
ground floor office. Also, fan convector heaters where installed in the ground floor office. All new
LTHW distribution pipework was connected on to the existing system and installed through out the 4
floors in the building. New radiators where installed to provide heating to all meeting rooms and
smaller offices on floors all new sanitaryware was installed over 4 of the floors. On the 4 th floor a new
shower block was installed.