Provision of new mechanical and public health services to new building. Objectives of the project include installation of long-lasting, energy efficient plant and equipment to minimise energy consumption.
The building shall include:
- Public WC facilities
- Small retail unit at road level & promenade level
- Restaurant spanning two of the 3 floors.
AD Mechanical are among the firms partnering to deliver rebuilding a new multi-use facility on Brighton Seafront.
The scope of work underway includes:
ADM installed all new above ground drainage and vent pipes through the building which terminated via a bespoke made plenum arrangement. We also supplied and located a large AHU on mezzanine level plantroom before all windows are where installed. 5 no. MCWS where bought into the building and capped for future fit out, we also installed high level fire rated ductwork for future connection from restaurant fit out company. 2 no. AC systems where installed serving the retail area located on the ground floor and the pavilion level.